What is the maximum allowable drainage area for a temporary slope drain?

Prepare for the Florida Stormwater, Erosion, and Sedimentation Control Exam with engaging questions and detailed explanations. Enhance your knowledge and build confidence to excel in your exam!

The maximum allowable drainage area for a temporary slope drain is set at 5 acres. This limit is established to ensure effective management of stormwater runoff and control erosion during construction activities. A temporary slope drain is designed to direct water away from the disturbed areas and reduce the potential for soil erosion, which can be significant when large volumes of water are concentrated on steep slopes.

When the drainage area exceeds this limit, the efficiency of the slope drain can be compromised, leading to increased risks of erosion, sediment transport, and potential downstream water quality issues. Managing a drainage area of this size helps to maintain effective control measures that prevent undue stress on the drainage systems and the surrounding environment. By adhering to the 5-acre maximum, construction practices align with regulatory standards aimed at minimizing sedimentation and protecting water resources.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy